main view 1
Insulation, drywall and taping. In short (re)building the drywall and ceiling, covering up sections that were opened for the rough-in, and restoring insulation to outside walls.
The insulation, electrical and plumbing inspections have to be completed before the drywall can be completely closed up - these are dependencies affecting the schedule. As of Thursday, the electrical and insulation inspections have passed.